21.09.2023
SABA GROUP KZ has gifted a park to the Medeu District.

As part of the construction of the new residential complex Arman City, we decided to please not only the future residents, but also all inhabitants of the Medeu District.

The construction of a new park area on Khalliulina St. is completed: green plants have been planted, benches installed, pavements laid out, and children's playgrounds with rubber coatings were equipped with play complexes.

A workout area has been set up, and street lights have been installed for evening walks.

In total, 3.5 hectares have been allocated for urban space, which will house not just the park area, but also a future general education school, which we will gift to the city.

"This project was implemented as part of the construction of a new residential complex "Arman city" - the "city of dreams" in the new Kazakhstan. The complex meets all modern requirements - it provides all essential services: a kindergarten, clinic, cafes, restaurants, police station, and includes underground parking. The building heights in the design will not exceed 6 floors, with a facade finish resembling clinker brick. The complex is distinguished by its seismic resistance, achieved through the reinforcement of the foundation with bored piles. Special technical conditions of KazRDICA for reinforcing monolithic structures up to 10 points have been observed. Each apartment is equipped with autonomous gas boilers, independent from the city's central heating and hot water supply."

President of SABA GROUP KZ, Yerzhan Abdikadirov.

Find out more in the new articles from the country's leading news sources:

zakon.kz

tengrinews.kz